Reply To: 2.0 Operation 2017-12-21T14:49:08+00:00

HOME Forums Gateways EZSrve 2.0 Operation Reply To: 2.0 Operation

Anonymous
Post count: 1001

The screen captures show the Action definition for B16 X10 On Condition to trigger the Action. I used an ICON Switch for the Effect. The Off Action definition is the same, except the Condition value is 3. The trace is from SDM3 which reflects the B16 On which turned the ICON Switch on, followed by the B16 Off which turned the ICON Switch Off.

PLC:eventraw=08
PLC:receiveX10raw=00 EC
PLC:receiveX10=B16
PLC:eventraw=08
PLC:receiveX10raw=01 E2
PLC:receiveX10=B On
PLC:eventraw=02
PLC:eventraw=03
PLC:receiveinsteonraw=02 05 EA 28 04 56 50 0B 11 FF
PLC:eventraw=03
PLC:eventraw=02
PLC:eventraw=03
PLC:receiveinsteonraw=02 05 EA 28 04 56 50 0B 19 00
PLC:eventraw=03
PLC:eventraw=08
PLC:receiveX10raw=00 EC
PLC:receiveX10=B16
PLC:eventraw=08
PLC:receiveX10raw=01 E3
PLC:receiveX10=B Off
PLC:eventraw=02
PLC:eventraw=03
PLC:receiveinsteonraw=02 05 EA 28 04 56 50 0B 11 00
PLC:eventraw=02
PLC:eventraw=03
PLC:receiveinsteonraw=02 05 EA 28 04 56 50 0B 19 00
PLC:eventraw=03
PLC:eventraw=03[attachment=1:2uxyhzn3]ActionB16X10On.JPG[/attachment:2uxyhzn3][attachment=0:2uxyhzn3]ConditionB16X10On.JPG[/attachment:2uxyhzn3]